Civil Works
Tun Razak Exchange (TRX), Kuala Lumpur, Malaysia
Earthworks, Retaining Walls and Foundation Works for Package 3A &3B
On 19 April 2013, WCT was awarded the RM169.3 million contract by TRX City Sdn Bhd to undertake the civil works of the Tun Razak Exchange mixed development in Kuala Lumpur.

The scope of works includes site clearing, test piles (compression test and tension test), trial grouting, tree transplanting, silt trap, base and curtain grouting, earth and rock excavation, temporary drainage, rock bolts, probing and bored piles works, and raft foundation.

Earthworks for Lifestyle Quarter (Phase 1)
On 5 October 2015, WCT was awarded a RM70.4 million contract by TRX City Sdn Bhd The scope of works includes earthworks, rock probing and grouting works for the Lifestyle Quarter (Phase 1) of the Kuala Lumpur International Financial District.

Infrastructure and Roadways for TRX Contract 2
On 19 October 2015, WCT secured a RM755 million infrastructure and roadway contract from TRX City Sdn Bhd. 

The scope of works under this contract encompasses earthworks, piling works, underground roadworks, at grade roadway works, elevated roadway works, design and built of the combined utilities tunnel, external underground structure (the Imbi Link Tunnel using New Austrian Tunnelling Method (NATM) and MRT Pedestrian Link), M&E works and traffic management at three main roads namely Jalan Tun Razak, Jalan David and Imbi Link Tunnel.

Earthwork & Piling Work (Affin Bank)
On 28 April 2017, WCT accepted a RM19.8 million contract by Affin Bank. The scope of work includes earthwork and piling work for a 47-storey office tower. It is a fast track project with a completion period of 7 months.