LRT3 - Bandar Utama to Johan Setia (Package GS03)
On 29 August 2017, WCT Berhad secured a contract worth RM840 million from Prasarana Malaysia Berhad to undertake and complete Package GS03 of the construction and completion of Guideway, Stations, Park and Ride, Ancillary Buildings and other associated works for the construction and completion of Light Rail Transit Line 3 (LRT3) from Bandar Utama to Johan Setia.

The total length of Package GS03 is approximately 2.84km from Suria Damansara to Temasya Glenmarie with two stations, namely Persada Plus Station and Station 3. The project is expected to be completed in 33 months from the date of the Letter of Acceptance.

LRT3 is a double-track rail alignment of approximately 37 kilometre long with 26 stations covering the areas of Bandar Utama, Shah Alam and Klang, before terminating at Johan Setia in Klang.